pic84.jpgpic85.jpgpic86.jpgpic78.jpgrestoration of the sandman has picked up a gear, check out the completed underside of the floor, all holes ,dents and imperfections have been repaired, and floor painted with por 15 as a base coat, and two packed on top
Bookmarks